SitePlanWorks

67 styles · redrawn by the engine on every build

What can go on your lot?

67 styles across 12 categories, each drawn on a lot with its setbacks and lot coverage measured. 0 failed to draw.

free · no sign-up · seconds

Rendered site plan of the worked example lot on 1952 Waverley St
Worked example · one real lot

What’s there now, what a pool would look like, and the drawings to permit it

One real 17,434 sq ft lot, read from an address and a satellite photo. Before and after, 5 drawings with what each one is for — and the piece of the lot we refused to guess at.

nothing uploaded · no survey · see the whole thing →

Decks & patios

8 sheets · DECK 01–08

The cleanest category to permit: most decks fall inside the prescriptive tables (IRC R507 and the AWC span tables), so no engineer has to stamp anything. What the counter wants is a site plan and a framing plan.

Patio covers & pergolas

5 sheets · COVER 01–05

Roofed but not enclosed, which is its own category in most codes — often exempt from coverage, rarely exempt from setbacks.

Pools & water

6 sheets · POOL 01–06

A pool is rarely refused for the pool. It is refused for the barrier, the equipment location, and the distance to the property line.

POOL 01Rectangular pooladds noneThe standard one, laid along the long axis of the yard.POOL 02Lap pooladds noneNarrow and long, for a yard that has length but no width.POOL 03Plunge pooladds noneSmall enough for a small lot and still deep enough to matter.POOL 04Pool with surroundadds nonePool plus the hard surface around it — count both against paving limits.POOL 05Standalone spaadds noneJust the hot tub, set against the house. Still needs the barrier.POOL 06Ornamental pondadds noneNot for swimming, which changes how it is classified.

Accessory dwelling units

6 sheets · ADU 01–06

The most-drawn category in California and the one whose rules move most often. Everything here needs a full sheet set; two of those sheets need a licensed stamp we do not give.

Garage conversions

4 sheets · CONVERSION 01–04

Nothing new is built, so coverage does not move — which is exactly why this route clears zoning on lots where a detached unit cannot.

Additions

9 sheets · ADDITION 01–09

An addition is measured against the same setbacks as the house it grows out of, and it is the fastest way to run out of coverage.

Sheds & backyard studios

2 sheets · SHED 01–02

Below a floor-area threshold most jurisdictions exempt a shed entirely. Above it, or once power runs to it, it is a permit like any other.

Garages & carports

5 sheets · GARAGE 01–05

Detached garages are building footprint, so they compete directly with the rest of the lot for coverage.

Driveways & paving

5 sheets · PAVING 01–05

Not building coverage — but many cities cap impervious surface separately, and a new curb cut is its own approval.

Fences, walls & landscape

8 sheets · FENCE 01–08

Usually the cheapest permit on this list and the one most often skipped. Height and corner visibility are what get them refused.

Septic, wells & equipment

4 sheets · UTILITY 01–04

Small footprints, and on every one of them the drawing is a clearance argument rather than a shape. This is also the group a photograph is worst at: most of what matters here is underground.

Commercial & multi-family

5 sheets · COMMERCIAL 01–05

The counter asks a different question here: not “does it fit” but “does it count”. Stall counts, accessible routes and enclosure access are the arithmetic a commercial sheet is checked against.