SitePlanWorks

Driveway widening on a 9,100 sq ft demo lot — aerial

Driveways & paving · PAVING 02

Driveway widening

A second strip beside the one that is there.

Site data

Lot
9,100 sq ft
Existing footprint
1,818 sq ft
This proposal
no added footprint
Building coverage
20.0%
Front / side / rear
89.0′ / 30.0′ / 5.0′
Scale
1″ = 20′

measured off the compiled model · no engine diagnostics · sizes are placeholders until this is drawn on your lot

Put this on your lot

free · no sign-up · seconds

01

One sheet, from one model

These are not separate drawings kept in step by hand. They are projections of the same model, so a change to the model changes all of them at once. A proposal with no interior has nothing to elevate or section — so the engine produces one sheet and does not pad the set.

Sheet A-001 — Site plan

02

Why this passes — and what sends one back

  1. Setbacks measured to the new edge, not to the house — 30.0′ to the nearer side line here.
  2. The scale is written down (1″ = 20′), not left to be inferred from the page size.
  3. North arrow on the sheet.
  4. Existing dashed, proposed solid. This is the first thing read at the counter, and getting it backwards is a refusal on its own.
  5. The coverage arithmetic is shown, not just its result — 1,818 sq ft existing and nothing added, so coverage does not move.

What sends this one back

The half of the driveway that isn’t yours

The paving on your lot is one approval; the curb cut and apron sit in the public right-of-way and belong to public works. Plans that show only the private half come back asking about the half the city owns.

What the sky can’t see — you add these

  • Paving hidden under tree canopy — it counts toward impervious totals the photo cannot add up
  • The recorded right-of-way width at your frontage

provide them and they go on the sheet · invented lines never do

03

Same lot, 5 ways

What this is not

This page is a demonstration our engine drew — not a permit that was submitted and not a drawing that was approved. Structural calculations and Title 24 energy compliance have to be signed by a licensed engineer or a certified analyst: we hand those off and we do not stamp them. Decks and small wood structures mostly fall inside the prescriptive tables and need no stamp at all, which is why they are the cleanest category here.

Put this on your lot

Free. Opens the editor with this category already on screen.