SitePlanWorks

Loft ADU on a 7,200 sq ft demo lot — aerial

Accessory dwelling units · ADU 04

Loft ADU

Small footprint, height instead of width. Good on a tight lot.

Site data

Lot
7,200 sq ft
Existing footprint
1,439 sq ft
This proposal
360 sq ft
Building coverage
25.0%
Front / side / rear
97.0′ / 20.0′ / 5.0′
Scale
1″ = 20′

measured off the compiled model · no engine diagnostics · sizes are placeholders until this is drawn on your lot

Put this on your lot

free · no sign-up · seconds

01

5 sheets, from one model

These are not separate drawings kept in step by hand. They are projections of the same model, so a change to the model changes all of them at once.

Sheet A-001 — Site plan

02

Why this passes — and what sends one back

  1. Setbacks measured to the new edge, not to the house — 20.0′ to the nearer side line here.
  2. The scale is written down (1″ = 20′), not left to be inferred from the page size.
  3. North arrow on the sheet.
  4. Existing dashed, proposed solid. This is the first thing read at the counter, and getting it backwards is a refusal on its own.
  5. The coverage arithmetic is shown, not just its result — 1,439 sq ft existing + 360 sq ft proposed over 7,200 sq ft of lot.

What sends this one back

Traced at the eave, judged at the wall

Coverage and setbacks are measured at the foundation, but a satellite sees the roof — two to three feet bigger on every side. The incumbents’ own support replies ask the customer for the eave overhang after the drawing bounces; this sheet asks first.

What the sky can’t see — you add these

  • The eave overhang, so the roof trace can be pulled back to the wall
  • Recorded easements the unit must clear
  • Where the sewer lateral runs — the connection trench crosses the yard somewhere

provide them and they go on the sheet · invented lines never do

03

Same lot, 6 ways

What this is not

This page is a demonstration our engine drew — not a permit that was submitted and not a drawing that was approved. Structural calculations and Title 24 energy compliance have to be signed by a licensed engineer or a certified analyst: we hand those off and we do not stamp them. Decks and small wood structures mostly fall inside the prescriptive tables and need no stamp at all, which is why they are the cleanest category here.

Put this on your lot

Free. Opens the editor with this category already on screen.